Renovation Committee
The Tibetan Canadian Cultural Centre (TCCC) Renovation Committee has been established by the TCCC board to achieve transformation in three areas within the existing facility at 40 Titan Road in Toronto, Ontario. A phased approach has been recommended.
Phase 1 (completed in July 6, 2019) – On the north side where the current three statues are hosted, the space will be rehabilitated into a assembly hall by lifting the roof and also to create a multi-purpose recreational space. Two large rooms with washroom along with change/shower room for boys and girls is within scope. A full size kitchen is also part of the plan.
Phase 2 (ongoing) – the currently the east side of the current Banquet hall will be used to create classrooms for language classes.
Phase 3 – the south side (entrance of facility) will be reverted to the two storey office space and the space on the first floor lobby will include the reception area, library, gift shop, meeting rooms and some offices. The facade will also be upgraded with Tibetan architectural design.
The committee was formed and their first meeting was held on Thu October 1, 2015. The President and the Vice President of the TCCC board, chair the committee. The renovation team meets on a regularly basis at TCCC every Wednesday between 7-10 pm.
Committee accomplishments so far are below;
Phase I – Raised the Roof and Built a Multi-purpose Hall and Assembly Hall with Washrooms/Change Rooms
(Completed in July 2019)
- completed a community needs assessment
- a qualified and experienced architect was selected
- Schematic drawings and construction drawings have been completed
- 3D wooden model created
- Master Site or Floor Plan completed
- RFP process complete for choice of Contractor – bidding process
- Building Permit has been applied and approved
- Phased Approach – Phase 1 cost identified and construction has started – April 4, 2018 (Raising the roof for the Assembly Hall and the Multi-Purpose Hall)
- Fundraising initiatives
- Washroom / Change Rooms (In progress and expected to complete November 2019)
Phase II
- working with architects to design and cost the Classrooms and Kitchen Storage and a Permanent Stage
Committee Members:
- Phase II and III – Tsering Wangyal (Chair), Tsering Dorjee, Tashi Lhundup, Kunsang Datok, Lobsang Mentuh, Lhoudup Dorjee, Tsering Samdrup, Pemma Mentuh, Tsering Wangyal, Will Sutherland, Dolma Tulotsang, Tsetan Badheytsang
- Phase I – Sonam Lankar (Co-Chair), Tashi Lhundup (Co-Chair), Tsering Dorjee, Kunsang Datok, , Lobsang Mentuh, Lhoudup Dorjee, Tsering Samdrup, Pemma Mentuh, Tsering Wangyal, Will Sutherland, Dolma Tulotsang, Tsetan Badheytsang, Tsering Kalsang